Pleasant Valley Landshaping LLC

Call Directions Contact the business

Pleasant Valley Landshaping LLC Excavation and Landscaping Services

Two small boulder walls today.
10/21/2026

Two small boulder walls today.

10/21/2026

After backfilling the septic tank and all plumbing with sand here we are spreading the spoils from the hole and trench. Next up are a few small Boulder retaining walls

Second Presby mound ready for topsoil.  Now both septic systems are functional.
10/21/2026

Second Presby mound ready for topsoil. Now both septic systems are functional.

You know the saying " a shoemakers children go barefoot".  The same holds true for an excavators driveway.  Ruts top to ...
10/18/2026

You know the saying " a shoemakers children go barefoot". The same holds true for an excavators driveway. Ruts top to bottom causing coffee spills every morning for a month. Finally gave it some attention today.

People ask what I do on my weekend days off.  Well I clean and lubricate the machines, check all fluids and water traps,...
10/17/2026

People ask what I do on my weekend days off. Well I clean and lubricate the machines, check all fluids and water traps, do site visits, create estimates, pay my suppliers, deposits checks (online thankfully), clean the garage and for fun go to the dump. Owning your own business is the most gratifying career but you need to make sure to find a balance between it and family time. I'm getting better at that finally. So I'll throw a few fun family pictures in here too.

Second Presby mound ready for inlet hookup and then topsoil.  Inlet gets installed on same end as the vent pipe.  Lookin...
10/15/2026

Second Presby mound ready for inlet hookup and then topsoil. Inlet gets installed on same end as the vent pipe. Looking forward to wrapping these two systems up next week.

Presby mound system  #2 install today.  Not sure I'm a big fan of these systems.  These pipes, caps and couplings seem r...
10/14/2026

Presby mound system #2 install today. Not sure I'm a big fan of these systems. These pipes, caps and couplings seem really cheap and flimsy. Maybe it doesn't matter? , They seem to be getting more popular so they must work well? Each 70' long run is made up of seven 10' sections and the adjacent 70' line is 2-3/8" lower than the one next to it. The highest row is 7-1/8" higher than the lowest row.
Anyone else have an opinion on these?

Installed two 1000 gallon propane tanks.
10/13/2026

Installed two 1000 gallon propane tanks.

This is the nicest mini excavator I have ever operated.  So smooth and so strong.
10/06/2026

This is the nicest mini excavator I have ever operated. So smooth and so strong.

10/04/2026

Werk Brau 45mm pin hydraulic quick coupler is safe, dependable and very well designed and built. It's designed so that even if you don't grab the back pin the bucket can't come loose from the machine. Here is a quick look.

Address

Pleasant Valley Road
Cambridge, VT
05444

Telephone

+18027526424

Website

Alerts

Be the first to know and let us send you an email when Pleasant Valley Landshaping LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pleasant Valley Landshaping LLC:

Shortcuts

Share