02/05/2026
Project updates, We have 3 currently ongoing.
First we have our North Syracuse 2 car garage addition with 2 bedrooms above it. LP smart siding is going on. The windows and doors have been installed. Wired Right Electric will be back Monday to install the electrical finishes for us. All the drywall has been finished and primed. Last few steps until we can turn this one over to the amazing family we are building it for.
Next we have our Onondaga Hill primary ensuite. The tiling has just wrapped up and look perfect! Nic is installing the 10' long double sink vanity this week. He will move on the trim work and installing the new widows in the coming week. Shower finishes and last touches to follow. This will be a great getaway at home very soon.
Finally we have a full basement build out in Chittenango. Al of our framing and electrical rough-ins are done. We will be adding subfloor panels and Rockwool insulation next week. This basement will be a huge family room with built-ins for the homeowners guitar collection. Adding a large home gym. Plus an oversized home office . All while keeping a lot of dry storage area and planning space for a future bathroom.
Thanks for reading, liking and sharing! Reach out to discuss any of your upcoming home renovation projects!.