10/21/2026
Another waterfront transformation completed in Cape Coral! 🌴🚤
Take a walk with us through this custom dock project, featuring a 16,000 lb boat lift, a tiki hut, underwater lighting, and all the finishing touches that turn a simple dock into the perfect waterfront hangout.
From the dock construction to the electrical work and final details, Coastal Marine Group handled it all.
Ready to upgrade your waterfront? Let’s build yours!
📍 Cape Coral, FL
📞 239-372-4586
🌐 CMGdocks.com
SWFL CustomDocks MarineConstruction