04/22/2026
Project Completed Highlight – Thurston County - Meridian Ave ADA Improvements
C-Denney Construction completed ADA and sidewalk improvements along Meridian Ave for Thurston County in Olympia wa.
Scope included removal of existing concrete ADA ramps, roadway asphalt demo, re-grading, new curb & gutter, drainage ditch work, and installation of 4 ADA ramps and 320 LF of new sidewalk to improve pedestrian safety on both sides of the roadway.
Concrete by RL Alia
Asphalt patchback by Becker Blacktop
ADA ramps, sidewalks, roadway improvements , this is the type of work our crew specializes in. If you have a similar project coming up, we’d be glad to take a look