We are making steady progress on our landscaping project in Irvine. Pouring concrete with a Topcast #1 sand finish. Since we did a soils report on this project we knew we had to mitigate expansive soils. Minimum requirements from the soils engineer is 16” on center #4 rebar. Since we are required to put 12” on center rebar within 3’ of the pool by code we carry that throughout the deck. The wire mesh we lay on top helps to reduce shrinkage cracks. Thanks to for that detail.