03/31/2017
Well here is the latest and greatest project!
1st story basic remodel, although the project became more elaborate when we moved the staircase over 18" (removed transition in ceiling as well as widen the staircase), this changed the weight load points on the floor, so we had to frame a wall in the basement to support weight. We also had to frame a landing in the staircase because we ran out of headroom (code is 6'8" from slope line of stair-nose). Customer wanted to save and reinstall all the old trim, and even though it was a lot preparation to make it paintable (where the paint would really adhere) we were really happy with how it turned out!
Electrical was done by All Phase Electric (Zach Holbrook 715-851-8658)
Floors were refinished by John Smith (715-571-7536)
Upstairs floor done by Samuel Holbrook (715-250-1117)
Drywall was finished by Mike Maule (715-851-0386)
Call them for an estimate! Great subs to work with!