D.M. Tile

D.M. Tile Residential Ceramic, Porcelain and Natural Stone Tile work
Out of Centreville, MD

05/28/2026

3 months of work compressed into 3 seconds 😬

Looking forward to wrapping up loose ends here and getting to see everything uncovered and finished 😍

Another one down!
05/15/2026

Another one down!

2 more bathrooms grouted and ready for caulk on this job. Starting the next one Monday πŸ’ͺ🏻
05/09/2026

2 more bathrooms grouted and ready for caulk on this job. Starting the next one Monday πŸ’ͺ🏻

Productive week here this week!Rolling through the first shower, just waiting on some slabs to wrap things up. Hopping i...
04/17/2026

Productive week here this week!

Rolling through the first shower, just waiting on some slabs to wrap things up.

Hopping into another bathroom Monday morning.

Until then 🍻

I did a little weekend warrioring this weekend. Everything is mostly wrapped up on this project!Prepped these old brick ...
04/12/2026

I did a little weekend warrioring this weekend. Everything is mostly wrapped up on this project!

Prepped these old brick fireplaces flat, installed hand painted tile around them, finished the 4x4s in the kitchen and got it all grouted and mostly caulked.

I painted the world orange this week! Finished the prep work in 7 showers this week. Actually burned through a whole 100...
04/10/2026

I painted the world orange this week!

Finished the prep work in 7 showers this week. Actually burned through a whole 1000' Kerdi band cheese wheel before finishing the 8th 😬

Floors are completed on this project!
03/28/2026

Floors are completed on this project!

Ending week 3 on a good note on this project πŸ€™All walls prepped and boarded on week oneFloor prep completed and laundry ...
03/13/2026

Ending week 3 on a good note on this project πŸ€™

All walls prepped and boarded on week one
Floor prep completed and laundry floor installed week 2
Shower floors prepped and got 2 bathroom floors down week 3

Got some more fun installs here next week 😬

Productive first week on this project! All my walls are shimmed flat/plumb and the board is all up! Floors start going d...
02/27/2026

Productive first week on this project! All my walls are shimmed flat/plumb and the board is all up! Floors start going down next week πŸ€™

First time giving this .with.foam system a shot and I'm wishing I tried it sooner! More efficient than the way I've been...
02/25/2026

First time giving this .with.foam system a shot and I'm wishing I tried it sooner! More efficient than the way I've been doing it and having a 3/32" shim really gets things dialed in!

If you haven't tried it, you should!

Address

Ingleside
Centreville, MD
21617

Alerts

Be the first to know and let us send you an email when D.M. Tile posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to D.M. Tile:

Share

Category