This project popped up as a memory from 3 years ago today.
I received a call to wire a dryer — which is normally a pretty common request. What wasn’t so common was learning that the dryer required four runs of conduit. Two runs needed 480V 3-phase at 100 amps, and the other two required 480V 3-phase at 80 amps.
Joe Josko and I installed over 200 feet of conduit on the first day, and the following day we pulled all of the conductors to power this industrial tent dryer.
A big thank you to Denney Electric Supply for helping get everything together so quickly.
And thanks to John, Kevin, and Roland at Denney Electric Supply for the support.
Always fun looking back at some of the larger projects we’ve had the opportunity to complete.
Projects like this are a great reminder that no two electrical jobs are ever the same.
— Mark Tobey Electric LLC
One of the more interesting projects we've worked on.