07/25/2026
This is the Maze Construction difference. Waterproofing done right. We only use the highest quality materials. The tile board we use is 100% waterproof. The schlitter pan that we use is far superior to the standard mud bed that most contractors use. We only use the very best waterproofing materials. On top of using waterproof on the shower pan we also silicone first so it's triple protected. Per code requirement all shower pans and dreams are tested thoroughly to make sure there's no leaks before we move on to the next step.