06/05/2026
Driveway rebuilt after the Parrotsville flood. We built up the low area with 120 tons of slate, added 40 tons of rip rap to line the ditch and rebuild around the tile at the creek. Capped the whole thing with 20 tons of gravel. A big thanks to Brandon Roberts and his hauling crew to get all the materials hauled in and the final gravel spread !!!