06/03/2026
We had the absolute pleasure of taking on a large job that presented its own set of challenges, we removed these 4 large chiller units an loaded them on trucks. Thank you Cole for such a great opportunity!
These units came in at 18k ,26k and 33k our team used our 70 ton unit, set of spreader bars an a trailer load of rigging we was able to get the job done safely an efficiently.