Speeler Companies

Speeler Companies Speeler Companies can help you get more enjoyment from your waterfront property. We will design a dock or Seawall that best suits your needs.
(1)

Making the most of your shoreline is what Speeler Marine Construction does best. Speeler has served Pinellas County, Florida for over 40 years as one of its leading Marine Contractors. The value of your waterfront home is dependent on your seawall’s integrity, your dock’s usefulness, and your boat lift’s convenience. Speeler uses only the finest materials and latest marine construction practices t

o build durable seawalls, attractive docks, and dependable boat lifts. Speeler’s experience and detailed quality control will make the most of your waterfront investment. Docks - Today’s engineered lumber assures your dock will last long into the future. Speeler’s designers make sure you get the best and most efficient use of your waterway. Lifts - Heavy duty and dependable boat lifts make the launching and storage of your boat safer and more convenient. We have Boat Lifts for boats weighing from 1,500 pounds to 120,000 pounds. Seawalls – Speeler's designers utilize their experience, their engineering know-how, and the latest technology in seawall design to create a long-lasting seawall. Vinyl, wood, or concrete – Speeler does it all. MARINE CONSTRUCTION SERVICES

DOCKS (BOAT DOCKS, FISHING DOCKS)
LIFTS (BOAT LIFTS, BOATLIFTS, BOAT HOISTS, CRADLE LIFTS)
SEAWALLS (BULKHEADS, RIPRAP, RETAINING WALLS)
FOUNDATIONS (UNDERPINING, HYDRAULIC GROUT)
REPAIR

The Speeler name has been recognized as the leading marine contractor in the Tampa Bay area since 1980. Our local reputation of being a trusted, high quality service contractor stems from the personal relationships that we’ve developed over the past 40+ years with customers throughout our coastal community, making us the best marine construction company. As a sustainable and socially responsible family-owned business, our clients come to us for our industry experience, comprehensive services, and start-to-finish accountability. We combine our many years of marine construction experience, the best building practices, and the latest technology available to provide our clients with outstanding

WHY WE’RE THE BEST

Experience - We have been installing and repairing seawalls, docks, and lifts for over 40 years. Value - Our affordability comes from the efficiency of expertise and smooth-running crews.
100% Oversight - From start to finish, licensed and expert managers oversee all projects, ensuring perfection, timeliness, and safety. Local Experts - Locally owned and operated business. We understand Florida waterways, permitting, and best use.

04/29/2026

On-site with Speeler Companies — walking through how we frame a dock the right way. Precision, durability, and no shortcuts. ⚡️
Contact Us: 727-530-4751

04/09/2026

At Speeler Companies, we handle everything your waterfront property needs — from docks and boat lifts to seawalls and full marine construction. 🌊⚓️

Doug Speeler breaks down exactly what we offer, but more importantly, you’ll hear directly from our clients. Real testimonials, real results. That’s what separates us.

We take pride in doing the job right the first time and being a company people can rely on. When our customers speak on the quality of our work and our consistency, that’s what matters most.

If you want dependable work done the right way, Speeler Companies is the name to trust.

Another successful job completed by Speeler Companies down in Treasure Island ⚓️From start to finish, this project came ...
04/03/2026

Another successful job completed by Speeler Companies down in Treasure Island ⚓️
From start to finish, this project came together clean—dialed-in details, an option of Barefoot Grey composite decking and a finished look that speaks for itself. The white skirting, bumpers, and custom touches really brought everything together on this one.
If you’re looking to upgrade your dock, lift, or waterfront setup, we take pride in doing it the right way every time.
📩 Reach out to get your project started.
Call: (727) 530-4751
Email: [email protected]

03/27/2026

When’s the last time you serviced your boat lift? ⚠️

Most people don’t think about it… until it stops working—or worse, drops their boat.

Saltwater, humidity, and constant use in saltwater areas will wear down cables, motors, and hardware faster than you think. Regular maintenance isn’t just recommended—it’s what keeps your investment safe.

At Speeler Companies, we specialize in keeping boat lifts running smooth, reliable, and built to handle Florida conditions year-round.

Don’t wait for a failure. Stay ahead of it.

📩 Contact us to schedule a service: (727)530-4751

03/27/2026

Worked right here at Marker 1 Marina 🌊

When you’re dealing with waterfront structures, there’s no room for shortcuts. Every dock, seawall, and lift has to be built to handle Florida conditions—and built to last.

At Speeler Companies, this is what we do every day. From Clearwater and all around the bay area, we’ve been trusted on projects just like this for decades—delivering solid, reliable marine construction across the bay area. 

📩 Contact us for a quote- (727)530-4751
Email: [email protected]

Finished with "BareFoot Sand" WearDeck Composite Decking and full composite handrail and bench with "White" structure an...
02/23/2026

Finished with "BareFoot Sand" WearDeck Composite Decking and full composite handrail and bench with "White" structure and "BareFoot Sand" top boards. Includes six bollard piling with white piling caps, piling wraps, and a 24,000 # capacity G3 Neptune Boatlift with SEArmor Package

Join our Referral Program Today!Earn a $500 Decks and Docks gift card with every qualifying new referral!Gift Cards can ...
02/11/2026

Join our Referral Program Today!

Earn a $500 Decks and Docks gift card with every qualifying new referral!
Gift Cards can be used for decking, lumber, or dock accessories.

Offer valid until May 1, 2026. Terms and Conditions apply.

Finished with “BareFoot Gray” WearDeck composite decking, complemented by a full composite handrail and bench with “Bare...
02/10/2026

Finished with “BareFoot Gray” WearDeck composite decking, complemented by a full composite handrail and bench with “BareFoot Gray” top board and white support structure. The project is completed with a 13,000‑lb G3 High Speed Neptune Boatlift.

Come see us at the St. Petersburg Power & Sailboat Show! ⚓️We’re offering special incentives and free merchandise giveaw...
01/16/2026

Come see us at the St. Petersburg Power & Sailboat Show! ⚓️

We’re offering special incentives and free merchandise giveaways, so be sure to stop by our booth.

Boatlifts on display:
• Neptune 13,000 # capacity G3 High‑Speed Direct Drive 4‑Post Lift
• Neptune 16,000 # capacity G6 SuperFast Direct Drive 4‑Post Lift
• Neptune 50,000 # capacity G6 SuperFast Direct Drive 8‑Post Yacht Lift

We can’t wait to see you there!

Address

6111 142nd Avenue N
Clearwater, FL
33760

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17275304751

Alerts

Be the first to know and let us send you an email when Speeler Companies posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Speeler Companies:

Share

Category