08/16/2026
How long does a remodel really take? Here's a rough timeline.
Every project is different, but most full remodels follow a similar rhythm:
✅ Design & Planning (2 to 4 weeks): Finalizing layout, materials, and permits before anyone picks up a tool
✅ Demo (1 to 3 days): Fast, but it's also when hidden issues (plumbing, electrical, water damage) tend to surface
✅ Construction (4 to 10 weeks): The bulk of the timeline. Framing, rough-ins, cabinetry, and finishes all happen here
✅ Final Touches & Walkthrough (1 to 2 weeks): Punch list items, inspections, and making sure everything is done right
Knowing what to expect at each stage helps you plan around it (whether that's setting up a temporary kitchen or blocking off time to handle decisions as they come up).
Curious what a realistic timeline looks like for your specific project? That's exactly what we walk through with clients before day one.