Capital Railroad Contracting

Call Directions Website

Capital Railroad Contracting Capital Railroad Contracting was established in 1987, focusing on every aspect of railroad maintenance and construction.

Projects like railroad bridges, track construction, switch and turnout installation, crossings, and tie replacement.

Your old bridge has new demands. Railroad bridge inspections help identify deterioration, damage and changing conditions...
10/29/2026

Your old bridge has new demands. Railroad bridge inspections help identify deterioration, damage and changing conditions before they affect safe operations.

Inspectors document findings, rank defects, and create records that help owners prioritize maintenance and repair decisions. A good inspection is not simply a checklist—it is the starting point for responsible asset management when an older bridge has new demands.

10/28/2026
Changing seasons bring changing jobsite conditions. Shorter daylight hours, colder mornings, wet leaves and early frost ...
10/27/2026

Changing seasons bring changing jobsite conditions. Shorter daylight hours, colder mornings, wet leaves and early frost can affect access, footing, visibility and equipment readiness.

The safest plan is the one that accounts for the conditions actually present—not the conditions expected when the plan was written. Pause, reassess and adjust before work begins.

Jack and BoreWhen utilities or culverts need to pass beneath railroad infrastructure, open trenching is not always an op...
10/22/2026

Jack and Bore

When utilities or culverts need to pass beneath railroad infrastructure, open trenching is not always an option. Jack-and-bore construction uses a launching pit, hydraulic force and an auger or cutting head to install steel casing beneath the crossing.

The method can reduce surface disruption while creating a protected route for utilities or drainage.

10/21/2026

In any successful project, the small things matter. Consistently measuring and double-checking your work should become second nature.

Here's why:
- Accuracy Boost: Reduces errors and enhances quality.
- Efficiency Gain: Saves time by preventing costly mistakes.
- Trust Building: Demonstrates reliability to clients and colleagues.

What makes someone successful in an entry-level railroad construction role?Experience helps, but employers also look for...
10/20/2026

What makes someone successful in an entry-level railroad construction role?

Experience helps, but employers also look for traits that cannot be taught quickly: dependability, willingness to learn, attention to safety, physical readiness and respect for the crew.

For the right person, an entry-level position can be the beginning of a long career in the railroad industr

10/15/2026

Water is one of the most persistent challenges facing railroad infrastructure.

Poor drainage can soften the subgrade, contaminate ballast, contribute to settlement and shorten the life of track components. Ditches, culverts and properly maintained ballast help move water away from the track structure.

Managing water is an essential part of maintaining reliable track.

Good communication is a piece of safety equipment every crew carries.Clear instructions, confirmed responsibilities and ...
10/13/2026

Good communication is a piece of safety equipment every crew carries.

Clear instructions, confirmed responsibilities and timely updates help prevent assumptions from becoming hazards. When conditions or plans change, every person affected needs the same information.

A strong crew does not simply talk—it confirms that the message was understood.

Directional Boring & Signal WorkInstalling conduit, cable and utilities around railroad infrastructure requires careful ...
10/08/2026

Directional Boring & Signal Work

Installing conduit, cable and utilities around railroad infrastructure requires careful planning and coordination. Directional boring can create an underground path while limiting surface disruption in locations where open excavation may not be practical.

Capital Railroad supports railroad and industrial projects with site preparation, boring, conduit installation and related signal work.

Address

8500 E Trade Center Drive
Columbia, MO
65201

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm
Sunday 8am - 5pm

Telephone

+15734743588

Alerts

Be the first to know and let us send you an email when Capital Railroad Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Nearby contractors