No Dig Construction

No Dig Construction We offer pipe lining services ranging from 10 inches to 180 inches in diameter. Our expertise includes arch, round, and elliptical shapes.

We provide a wide variety of material options. Installation, welding, and cellular grouting.

Cellular grouting is our jam for any weight and we're the pros who mix it onsite with cement and water - no fuss, no mus...
05/04/2026

Cellular grouting is our jam for any weight and we're the pros who mix it onsite with cement and water - no fuss, no muss, No Dig Construction LLC. Government contractor extraordinaire serving ODOT, counties, and cities of Ohio with over 100 years of combined experience - that's a whole lotta years! We've installed liners from nearly every manufacturer under the sun, and many of them have been installed in their full product range up to 144" OD. From 1005' 132" HDPE to 10" HDPE, we can get the job done right, on time, and at the right price. We also whip up LSM air-entrained fill as needed, and our pipe welding services are top-notch for HDPE and casing pipe. Contractors, we want to hear from you! Need your government crew schooled on the how-to? Give us a ring at 877-274-6499

Perfecting cellular grouting is a requirement in pipe lining. Having done this line of work for nearly a lifetime there ...
04/18/2026

Perfecting cellular grouting is a requirement in pipe lining. Having done this line of work for nearly a lifetime there is much to learn. We use a combination of swing tube and ball valve pumps based on the job requirements and monitor bars of pressure on a liner as it is grouted. Any weight (pcf) of grout can be achieved with our system. Each truck is weighed for quality control.

02/03/2026
We have been conducting an increasing number of inspections on concrete pipes, with some exhibiting joint separation and...
06/26/2025

We have been conducting an increasing number of inspections on concrete pipes, with some exhibiting joint separation and others needing grouting to prevent the road base from sinking. Joints can be patched, or can receive joint seals but lining offers a long-term fix by pressure grouting the joints that may have lost road base and backfill.

No Dig Construction LLC often can fit nearly the same size pipe as the existing concrete and fix any line and grade issues without road closure.

Had some interesting work this week in which I was both proud of our workers and of our ability to pivot with issues. Th...
04/26/2025

Had some interesting work this week in which I was both proud of our workers and of our ability to pivot with issues. They do not call us in to fix new work. It is usually an ugly duckling. Pic one is a culvert with no invert we did not want to rip out as a fiber line ran directly under it. We dug the sides and packed it with around 300 # of hydraulic cement. The entire pipe had no invert and took an additional amount of grout which filled voids above it which may have eventually have caused roadway issues.
Pic two is a project grouting a larger concrete pipe structure only to find out a lateral had been cut in and sealed over at some point. Excavator was on site so we dug up the concrete apron and side and sealed the old lateral. Messy work but we got it done. The concrete pipe joints also had no gasket or seal and had to be hand packed. Again the joints of concrete had most likely been letting in road bedding creating voids above and around the structure. We got it resolved w no damage to area. Our cellular grouting process is both structural and able to be pushed into voids. Pic 3 and 4 is of a setback on a PVC liner and .5" casing pipe with an improved inlet underway. This allows the larger host pipe to be used to receive more water entering the pipe and therefore more water flow into pipe allowing for a downsize in dimension for improvement of deficient structure. Water has the hardest time entering a smaller area. Note that liner is at same level of existing flow line nearly eliminating headwater backup.

Kudos to the diligent team at No Dig Construction. Following a challenging period of unseasonable weather, we have been ...
04/10/2025

Kudos to the diligent team at No Dig Construction. Following a challenging period of unseasonable weather, we have been working diligently to meet our deadlines. Our expertise in pipe installation and grouting has been instrumental in driving our success in 2025. With unparalleled experience in culvert slip lining and grouting, we are confident in our abilities. As my late father would say, "Don't call the hall, we do it all," encompassing slip lining installation, welding of plastic or steel pipe, cellular grouting, RCP, headwall restoration, and don't tell anyone, but we do excavation. Our commitment to quality is unwavering, and our owner's meticulous oversight ensures that every project meets the highest standards. We welcome subcontractor requests for estimates.

Reed swing tube getting setup for a larger grout pumping project.
04/08/2025

Reed swing tube getting setup for a larger grout pumping project.

Don't tell but No Dig Construction was digging. Bare w the mess as we make the equipment yard more usable and finally ge...
04/05/2025

Don't tell but No Dig Construction was digging. Bare w the mess as we make the equipment yard more usable and finally get the inside of storage building moving. We moved tons of dirt and a bunch of trees this winter and still more to go. Practice makes perfect, and who doesn't like moving dirt. Adding better entry and exit for equipment and storage.

Custom size 1/2 inch wall casing pipe installed.  Crew lined each joint pefect before welding. That is not so easy.
04/05/2025

Custom size 1/2 inch wall casing pipe installed. Crew lined each joint pefect before welding. That is not so easy.

Sometimes, you have to use a lot of pieces to make one big piece. In HDPE we call this a monolithic pipe or a pipe with ...
04/05/2025

Sometimes, you have to use a lot of pieces to make one big piece. In HDPE we call this a monolithic pipe or a pipe with no joints. Once the pipe is welded, the joints are as strong as the pipe. Having welders on staff with experience in all types of pipe welding is key!

Well, on this day, the welder kicked into high gear, with the crew dropping down 72" pieces, setting them, and moving them forward at about 1 piece per 30 minutes. The claim is a piece moved every 15 minutes but who is buying that! 1 - 10 hour day and 200 feet divided by 5 feet = 40 pieces. 10 hours divided by 40 = 15 minutes average per piece.
I'm not saying that is normal, but we all got it done. This is an older project, but I found it relevant to some of the challenges that lining can have.

Address

46513 Metz Road
Columbiana, OH
44408

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm
Saturday 10am - 3pm

Telephone

+13305198199

Alerts

Be the first to know and let us send you an email when No Dig Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to No Dig Construction:

Share

Category