08/26/2026
Replacement of a deteriorated concrete approach with broom finished concrete and tool cut control joints.
New approach was poured at 6” depth meeting city code and specifications. Sidewalk was raised to meet ADA code for proper cross slope.
If us a call today for a free estimate with any of your concrete needs!
614-539-5640