08/14/2026
Working alongside Buckeye Asphalt as the general contractor, this project included installing new footings for the replacement of two staircases at an apartment building, along with several sidewalk improvements.
With students returning soon, the schedule was fast-tracked to ensure the property was ready for occupancy before the school year begins. We're proud to have helped deliver this project and contribute to getting students housed before move-in season.
Go Bucks!