10/07/2026
Retaining wall project update
Wall is installed, backfilled and ready for caps and landscaping lighting.
A few things to finish out this job.
We have to install premium topsoil to replant the lawn front and back. Install 4x4s along the gravel driveway we installed in the back and railroad ties around a firepit area.
Final phase will be new landscape design with plants and mulch.
Www.lawnfirmllc.com