Optimum Construction

Optimum Construction Optimum Construction is a full-service commercial construction company and builder in New England We are committed to our clients, our community and ourselves.

As individuals, we are parents, partners, friends, world travelers, creative tinkerers, athletes, artists, and outdoor enthusiasts. As teammates we embody the best of professional collaboration. Our highest core values are integrity and collaboration. It is through honest and productive communication that the best partnerships are created. We believe that the best projects result from a thoroughly

transparent process; we are committed to our clients’ continual awareness of the details of progress, coordination, budget, and scheduling. We take responsibility and accountability for all our words and actions. We tell you everything you need to know so that you are always informed and kept up to date. Optimum’s approach to project management is straightforward: Proactive control of budget and schedule; collaboration; clear and honest communication. We believe that the process of building your home or commercial space should be both exciting and enjoyable. That is the standard we set for each project, and everyone at Optimum contributes to that standard. Our collective experience allows us to gracefully navigate the complexities of a construction project. When challenges occur, it is integral to our culture to remain level-headed and positive. Our philosophy on safety is simple: Nobody Gets Hurt. Knowing that one gap in judgment can lead to disastrous events, the safety of the men and women on our job sites and the community that surrounds our projects always comes first. Optimum never sits idle. As we relentlessly chase our dream, we continue to chase new and exciting opportunities.

We're hiring! Our culture is defined by our simple purpose – Build Better Relationships & Better Buildings. We believe t...
08/31/2026

We're hiring! Our culture is defined by our simple purpose – Build Better Relationships & Better Buildings. We believe taking the time to really know people (each other, our clients, our subcontractors) to be the key behind creating value and leading projects that connect people in New England.

Optimum Construction Inc.

Dr. Julissa Guerra spent years picturing her own practice. She came to us with a clear vision for the space, down to how...
08/25/2026

Dr. Julissa Guerra spent years picturing her own practice.

She came to us with a clear vision for the space, down to how she wanted patients to feel walking in. Our job was to turn that into ops, plumbing, imaging, and finishes that all land exactly where they need to be. She stayed involved the whole way, made decisions quickly, and knew what she wanted. That makes a build go well.

Credit to our subcontractors and vendors too. A dental fit-out is a lot of trades working in a small footprint, and this group did it right.

Congratulations, Dr. Guerra! Watching someone open the practice they have been imagining for years is the best part of this work!

Smilestry

Preconstruction is the planning phase that happens after a concept and before construction starts. It's where the drawin...
08/13/2026

Preconstruction is the planning phase that happens after a concept and before construction starts. It's where the drawings, the numbers, and the real-world logistics get reconciled. Done well, it's the cheapest place to solve problems, because changing a line on a drawing costs almost nothing compared to changing a wall that's already built.

A few decisions that matter most in preconstruction:

• Early cost estimating: Pricing the project while it's still on paper means budget surprises show up when they're easy and cheap to fix, not halfway through the build.
• Constructability review: Pressure-testing the design for how it actually gets built catches conflicts between trades before they become field delays.
• Value engineering: Looking for equal-or-better materials and methods at a lower cost, so savings come from smart choices, not cut corners.
• Long-lead procurement: Identifying the items with long delivery windows early, like switchgear, structural steel, or custom glazing, so they never become the thing that stalls the whole schedule.
• Site and permitting due diligence: Understanding soils, utilities, zoning, and the approval timeline up front, so the calendar reflects reality.
• A schedule built from subcontractor input: A timeline informed by the people doing the work is a timeline you can actually hold to.

We've built schools, restaurants, housing, commercial, and industrial buildings across New England, and the pattern holds every time: the projects that run smoothly are the ones that were planned thoroughly before anyone broke ground.

The earlier you bring in an experienced GC, the fewer surprises you hit later.

We're a couple of weeks out from handing over the Pine Tree Recovery Center in Westbrook.The project turned the old Nort...
08/05/2026

We're a couple of weeks out from handing over the Pine Tree Recovery Center in Westbrook.

The project turned the old Northern Light Mercy Hospital into a 28-room recovery facility. Right now the crew is installing hardware and kitchen tile backsplashes, and our superintendent is closing out the punch list, chasing down every last detail before we hand over the keys.

This one means a lot to us, and we're looking forward to sharing the final pictures soon.

Here's what most people don't realize about building a restaurant or hospitality space.The dining room is what guests se...
08/03/2026

Here's what most people don't realize about building a restaurant or hospitality space.

The dining room is what guests see. But the decisions that determine whether the place runs smoothly, passes inspection, and opens on time all happen in the parts they'll never look at.

A few of the things that go into a space like this before a single plate goes out:

• Kitchen Exhaust and Make-Up Air: the hood pulls a huge volume of air out of the building, and it has to be replaced in equal measure. Get the balance wrong and you have doors that stick, a dining room that's drafty, and a kitchen that runs hot. This gets designed early, not adjusted later.
• Grease Management: interceptors, grease-rated drain lines, and the right slopes keep the kitchen running and keep you on the right side of code. Undersizing here is one of the most common and most expensive things to fix after the fact.
• Utility Capacity: commercial ranges, walk-ins, and dish machines pull far more power, gas, and hot water than a standard build. Confirming the service can carry the full equipment schedule up front avoids a redesign once the equipment order is final.
• Washdown Surfaces and Drainage: floor drains, sealed floors, and washable wall finishes are what a health inspector looks for first. They're built into the structure, so they're planned before framing, not added on.
• Dining Room Acoustics: hard, easy-to-clean surfaces sound great to a health code and terrible to a guest. Managing sound so people can hear each other is part of whether they come back.

We've built restaurants, bars, and hospitality spaces across New England, from full kitchens to fast-casual buildouts and tenant fit-ups. We treat the systems behind the walls the same way we treat the finishes out front.

If you're an operator planning a new location or a renovation, the earlier you bring in an experienced GC, the fewer surprises you hit later.

The York High School science classroom renovation is in full swing. Finishes, MEP, final inspections, punchlist, and tur...
07/29/2026

The York High School science classroom renovation is in full swing. Finishes, MEP, final inspections, punchlist, and turnover are all stacked up before students and teachers walk back through the doors.

Institutional work doesn't get a soft landing. The date is real, the rooms have to work, and every answer in the field matters. Planning ahead for this summer slammer is what put us in control of a finish like this instead of chasing it.

That's the kind of work summer is built for.

Here's what most people don't realize about building multi-family housing.The decisions that make or break a project hap...
07/16/2026

Here's what most people don't realize about building multi-family housing.

The decisions that make or break a project happen long before a shovel hits the ground. When you have 40 units, every good decision in preconstruction pays back 40 times, and every bad one costs you 40 times.

A few of the decisions that matter most, all made before the drawings go out for permit:

• Structural System: wood-frame, podium, or steel sets your density, fire rating, MEP complexity, and schedule. Confirm it before the architectural drawings go too far.
• Plumbing Stacking: a dedicated chase that aligns on every floor keeps runs short. A two-foot inefficiency multiplies across 40 units.
• Sound Attenuation: code minimum (STC 45) is a legal threshold, not a livability standard. STC 50 to 55 costs little more but means better living conditions. It's nearly impossible to fix after framing.
• Common Area Durability: tenants decide on a building before they see the unit. Finish the lobbies and corridors for decades of traffic, not for the lowest upfront cost.
• MEP Coordination: four or five systems share a ceiling cavity of 12 to 18 inches. BIM coordination finds the conflicts before they become problems in the field.

We've built multi-family housing across New England, and the reason developers keep calling us back isn't a secret. We treat the decisions made in preconstruction the same way we treat the work in the field.

If you're a developer planning a multi-family build, the earlier you bring in an experienced GC, the fewer expensive surprises you hit later.

Looking forward to ICSC  on Monday! Excited to catch up with everyone and talk about some of the projects we’ve been wor...
07/10/2026

Looking forward to ICSC on Monday! Excited to catch up with everyone and talk about some of the projects we’ve been working on recently!

• Post Office Square
• Bath Iron Works Housing
• Smilestry
• The Gardner School

We're looking forward to being back at ICSC New England!On July 13 & 14, the Optimum Construction team will be in Boston...
07/08/2026

We're looking forward to being back at ICSC New England!

On July 13 & 14, the Optimum Construction team will be in Boston connecting with developers, owners, and industry partners from across New England.

If you're attending, we'd love to see you. Stop by Booth 511 to meet the team, talk about what's happening in the market, or simply catch up.

If you'd prefer to schedule some time in advance, feel free to reach out. We'd be happy to set aside time during the event to connect.

Looking forward to another great and seeing many familiar and new faces in the Seaport!

Happy Independence Day! As our nation celebrates its 250th anniversary, we're proud to do our part in building the commu...
07/04/2026

Happy Independence Day! As our nation celebrates its 250th anniversary, we're proud to do our part in building the communities where we live and work.

Whether it's creating spaces for businesses to grow, families to live, students to learn, or patients to receive care, every project is an opportunity to make a lasting impact.

From everyone at Optimum Construction, we wish you a safe and happy Fourth of July. 🇺🇸

Address

55 Ferncroft Road Suite 100
Danvers, MA
01923

Alerts

Be the first to know and let us send you an email when Optimum Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Optimum Construction:

Shortcuts

Share