09/02/2026
💧 How much can change between cooling tower inspections?
Performance losses don’t always show up as obvious failures. Changes in efficiency, energy use, water use, and cooling capacity can develop gradually between inspections.
This week’s HumpDay Blog explores why continuous cooling tower condition monitoring can provide a clearer picture of performance over time, especially as cooling demands grow.
👉 Read the full blog: https://hubs.li/Q04wn70g0
https://hubs.li/Q04wn70g0