Helmick Construction & Maintenance

Helmick Construction & Maintenance Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Helmick Construction & Maintenance, Construction Company, Davis, WV.

Helmick Construction and Maintenance is a Tucker County, WV construction company specializing in additions, remodeling, roofing, siding, windows, doors, decking, staining, painting, general home maintenance and new home construction.

When we arrived to help the new owners renovate, the kitchen had already been completed by the previous owners, but the ...
02/20/2026

When we arrived to help the new owners renovate, the kitchen had already been completed by the previous owners, but the rest of the home still needed work. One of the biggest changes was painting all the plywood walls/ceilings white, which sealed the wood and reduced some of the texture. New LVP flooring was installed throughout the house for a consistent look.

In the bedrooms, built-in bed frames were removed to allow for standard furniture. The bathrooms were updated with new vanities, toilets, and Wet Wall tub/shower combos. Outside, the hot tub was moved from the front deck to a new back deck. New light fixtures and baseboard heaters were also installed throughout the home.

Retro pink to modern blue. From the appearance of the bathroom we believe that last time it had been remodeled was the 1...
02/13/2026

Retro pink to modern blue.

From the appearance of the bathroom we believe that last time it had been remodeled was the 1980s. Due to the age of this 120+y/o Thomas home, and it settling on a hillside, there really wasn't a straight/square/plumb line in the bathroom. We ended up gutting the whole room from floor to ceiling. All plumbing and electrical were updated and a new subfloor was installed and leveled as much as possible before laying LVP flooring. A new ceiling also allowed us to gain an extra inch or two of height.

For the tub/shower, we installed a steel, porcelain-enameled bathtub with high-gloss tile, integrated corner shelves, and a multi-fixture setup with a tub spout, showerhead, and handheld option. The walls were painted Danube by Sherwin-Williams with glossy white trim. A new 36-inch vanity, updated lighting, towel bars, and mirror complete the space.

We're a little behind posting some of the transformations we've made over the years, so we're going to sprinkle some pos...
02/06/2026

We're a little behind posting some of the transformations we've made over the years, so we're going to sprinkle some posts about those in between our recent work.

The biggest transformation in this space was a 10-foot extension added to the back wall with the windows. To make that possible, we installed a new support beam that spans from the kitchen at the front of the house all the way to the back wall. While we were at it, we incorporated ducting into the new beam/bulkhead so the home could finally have A/C.

To keep the original character intact, new pine boards were carefully installed to match the 40+ year-old ceiling, and all cross beams were painted to match the original color. We also updated the electrical throughout, added a new lighting layout, installed drywall to brighten the space, and laid new laminate flooring. The wood-burning fireplace was replaced with a new gas unit, and a custom log mantel was added to the original stone face to complete this side of the room.

On the other side, the kitchen was completely redesigned and expanded, featuring custom KraftMaid cabinets, quartz countertops, a marble backsplash, and stainless steel appliances.

One of the many bathrooms that we updated in 2025. Removed the oversized bathtub, removed the window and installed a new...
02/03/2026

One of the many bathrooms that we updated in 2025. Removed the oversized bathtub, removed the window and installed a new walk-in shower. Updated the plumbing, insulation and baseboard heater. New vanity, mirror and flooring complete this renovation.

In a few stages over the course of fall to early winter, we stained the exterior, painted the interior, and installed ne...
01/30/2026

In a few stages over the course of fall to early winter, we stained the exterior, painted the interior, and installed new LVP flooring at this cozy cabin. It's great working on projects like this and helping keep homes looking their best year after year.

Right before the start of ski season we finished remodeling the kitchen and bathrooms at this beautiful slopeside home.T...
01/27/2026

Right before the start of ski season we finished remodeling the kitchen and bathrooms at this beautiful slopeside home.

The kitchen was truly done top to bottom. The ceiling was refinished smooth, a closet was removed to expand the kitchen square footage (involving relocating the hot water tank to the basement), and the location of major appliances were moved. Custom KraftMaid cabinets and quartz countertops, new lighting layout and LVP flooring were installed. The only thing that stayed in the same place was the kitchen sink.

In the upstairs bathroom it was decided to remove the oversized tub and relocate the sink to that wall in favor of more vanity space. Due to the unique ceiling/roof lines of this room hardwired, pre-lit mirrors were used with wall sconces to help light that area, along with additional lighting on the shower side of the room. The shower insert was removed so a fully tiled shower with glass door could be installed.

Merry Christmas from our crew to you.We always appreciate work.
12/25/2024

Merry Christmas from our crew to you.
We always appreciate work.

05/22/2023

Immediate opening on our lawncare crew. If you are looking for good money that you can earn before you go to college or just not sure what you want to do yet. Give us a call. (304) 641-0529.

These are the windows we installed about 2 weeks ago. Note the comparison of the door on the left to size of windows.
12/07/2021

These are the windows we installed about 2 weeks ago. Note the comparison of the door on the left to size of windows.

Large project involving 2 additions and remodeling. Coming along. The first 2 are before pictures.
11/18/2021

Large project involving 2 additions and remodeling. Coming along. The first 2 are before pictures.

Nice Trex deck we did this summer with stainless steel cable for railing.
11/18/2021

Nice Trex deck we did this summer with stainless steel cable for railing.

Address

Davis, WV
26260

Opening Hours

Monday 7am - 5:30pm
Tuesday 7am - 5:30pm
Wednesday 7am - 5:30pm
Thursday 7am - 5:30pm
Friday 7am - 5:30pm

Telephone

+13046410529

Website

Alerts

Be the first to know and let us send you an email when Helmick Construction & Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Helmick Construction & Maintenance:

Share