05/30/2025
A few Rants and Comments …..
I cannot recall, in the 40 plus years of building and remodeling, that we have ever received the rain we have had in May. Maybe not the amount of rainfall, but the consistency. It seems like most every day, we have a little or a lot. This makes it tough to schedule outside work. Keep in mind, that the threat of rain prevents a contractor from painting, pouring concrete, scheduling an excavator to dig a footer or foundation.
I recently received a mailing for construction site security. Their logo or slogan is, “Quit wasting time driving to you jobs”….. HELLOOOO, that is your job to be visiting your job sites. Sure, a camera can show you the crew is on site and working. It won’t show you the quality of their work, if they are doing it correctly.
And, if you stop and visit the crew, when they are trying to get work completed during all this rain, you earn their respect and gratitude. That can go long way for both you as the builder/remodeler/PM/ General Contractor, as well as the for the Owner.