All Service Contracting Corp.

All Service Contracting Corp. All Service Contracting Corp. We have successfully completed over 7,000 filter beds to date.

specializes in the removal and replacement of filter media from water and wastewater treatment facilities in both gravity and pressure type filters.

08/29/2023

Come on back, little more & ooosh*t !next.

Second Filter Tank set. 3rd and final tank should be ready 1st week of Jan. Next setting wont be so easy. Stay tuned.
12/13/2022

Second Filter Tank set. 3rd and final tank should be ready 1st week of Jan. Next setting wont be so easy. Stay tuned.

GETTING READY.
11/24/2022

GETTING READY.

11/24/2022

Legendary Machinery

One done, two more to go.  Followed by Leopold underdrain installation.
11/24/2022

One done, two more to go. Followed by Leopold underdrain installation.

The below photos, are of a Wheeler underdrain system that was installed in the late 50's this type of system requires 5 ...
07/27/2020

The below photos, are of a Wheeler underdrain system that was installed in the late 50's this type of system requires 5 (3") spheres, 8 (1 1/4") spheres, and 1 (1 3/8") spheres all of which are porcelain . Over a period of years the concrete surface tends to deteriorate due to all the water flow and chemical use. It is critical that the spheres in each hopper bottom stay in the original positions to ensure even flow during a backwash which cleans the media. In order to get the sphere back into their original position we install the All Service Liner that we manufacture. We not only manufacture the All Service Liner for the (14) sphere system, but we also manufacture the All Service Liner for the five sphere system. Once the All Service Liner is installed the spheres are placed followed by a pot fill gravel to help fill any voids. This is followed by various grades of gravel for supporting material. Each layer is placed and leveled prior to placement of the following layer. In most cases we utilize a sand and anthracite filtering media. However, in this case the owner prepurchased a glass media which we installed (2) layers of supporting, and then the final layer of a .45-.55 mm glass media. We have also include a microscopic photo of a .45mm sand and the .45-.55mm glass media so you can see it side by side along with photos of the glass, and sand separately.

Loading filter sand into vertical pressure vessels.
09/23/2019

Loading filter sand into vertical pressure vessels.

New header and lateral system in pressure vessel. Old underdrain plate rusted out.
08/19/2019

New header and lateral system in pressure vessel. Old underdrain plate rusted out.

Address

2024 E Damon Avenue
Decatur, IL
62526

Opening Hours

Monday 7:30am - 4:30pm
Tuesday 7:30am - 4:30pm
Wednesday 7:30pm - 4:30pm
Thursday 7:30am - 4:30pm
Friday 7:30am - 4:30pm

Telephone

+12172333018

Alerts

Be the first to know and let us send you an email when All Service Contracting Corp. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category