06/19/2022
Here is project we just wrapped up on a new build. The client worked with the City of Aurora to design a plan that would be low maintenance while also allowing for water conservation and still have an area for their pets to enjoy. We installed new irrigation, sod area, breeze pathway, breeze dog run, and installed multiple plants, bushes, flowers, and a tree. We also helped diverting downspouts to the lawn and redirected sump pump discharge to the drainage pathways from the property. We worked tirelessly this past week through the heat and completed this all in 1 week.