03/15/2023

More tileβ€¦πŸ‘

Tiling the shower has begunβ€¦πŸ‘
03/13/2023

Tiling the shower has begunβ€¦πŸ‘

Cabinets installed, majority of electrical is trimmed out, 1/2 bathroom toilet & vanity installed, most of the casing an...
02/23/2023

Cabinets installed, majority of electrical is trimmed out, 1/2 bathroom toilet & vanity installed, most of the casing and base is setπŸ˜ƒπŸ‘

More flooring πŸ˜ƒπŸ‘
02/17/2023

More flooring πŸ˜ƒπŸ‘

Rocked, taped, bead, and mud the walkthrough. Put down underlayment & started laying flooring πŸ˜ƒπŸ‘
02/15/2023

Rocked, taped, bead, and mud the walkthrough. Put down underlayment & started laying flooring πŸ˜ƒπŸ‘

Shower liner set, pan poured, durock installed, 1st coat of redgard on, and more doors πŸ˜ƒπŸ‘
02/01/2023

Shower liner set, pan poured, durock installed, 1st coat of redgard on, and more doors πŸ˜ƒπŸ‘

Tore out a finished wall, built a new header and made it a walkthrough. Also hung a couple doors.
01/30/2023

Tore out a finished wall, built a new header and made it a walkthrough. Also hung a couple doors.

3 coats of mud & a skim coat to finish it. Ready for paint πŸ‘
01/24/2023

3 coats of mud & a skim coat to finish it. Ready for paint πŸ‘

2 coats on everything, 3rd coat is coming. Then skim coat all of it for a flat finish πŸ˜ƒπŸ‘
01/18/2023

2 coats on everything, 3rd coat is coming. Then skim coat all of it for a flat finish πŸ˜ƒπŸ‘

All the drywall is hung. Now to get it beaded, then finish out the shower. Next it will be time to tape & mud. πŸ˜ƒπŸ‘
01/11/2023

All the drywall is hung. Now to get it beaded, then finish out the shower. Next it will be time to tape & mud. πŸ˜ƒπŸ‘

More drywall…Next is insulate interior walls and finish hanging the drywall πŸ˜ƒ
01/07/2023

More drywall…
Next is insulate interior walls and finish hanging the drywall πŸ˜ƒ

Had inspection today for rough-ins: framing, electrical, & plumbing. We’re good to go. So I started hanging walls πŸ˜ƒπŸ‘
01/07/2023

Had inspection today for rough-ins: framing, electrical, & plumbing. We’re good to go. So I started hanging walls πŸ˜ƒπŸ‘