Construction of Dr. Phillips Elementary School Construction progress for the replacement of Dr. Phillips Elementary School.

There are boxes everywhere... Good luck staff and teachers of Dr. Phillips Elementary School with the unpack and settlin...
07/28/2014

There are boxes everywhere... Good luck staff and teachers of Dr. Phillips Elementary School with the unpack and settling in. Good luck for a great year and amazing future to staff, teachers and especially to the students!

Final inspections were completed on 7/14/14 and the school opened for occupancy!  Principal Merchant and his staff moved...
07/28/2014

Final inspections were completed on 7/14/14 and the school opened for occupancy! Principal Merchant and his staff moved into the school last week.

We are in the home stretch of the project.  Major construction operations are complete.  We are cleaning up the building...
06/26/2014

We are in the home stretch of the project. Major construction operations are complete. We are cleaning up the building and the outside while performing final inspections with the Building Department. Completion and occupancy will be achieved within two weeks.

The interior spaces are coming together with infrastructure installation along with walls, paint and ceilings.  We plan ...
05/12/2014

The interior spaces are coming together with infrastructure installation along with walls, paint and ceilings. We plan to start the permanent air conditioning system this week which will allow for further installation of finishes.

The structural steel structure for the entire building is now complete.  We are pouring the concrete that will make up t...
02/17/2014

The structural steel structure for the entire building is now complete. We are pouring the concrete that will make up the second floor of the two-story structure on Monday (2/17).

Interior construction is well underway in half of the building with wall framing and installation of mechanical, electri...
02/17/2014

Interior construction is well underway in half of the building with wall framing and installation of mechanical, electrical, plumbing and fire sprinkler systems.

Roofing installation in progress.
02/17/2014

Roofing installation in progress.

Installation of steel framing started on 12/12/13.  We can install the roof once the steel framing is complete which wil...
12/16/2013

Installation of steel framing started on 12/12/13. We can install the roof once the steel framing is complete which will pave the way for us to start interior construction.

Here is what the building looks like inside the walls...
12/16/2013

Here is what the building looks like inside the walls...

We started tilting/lifting the wall panels today.  By the end of the week the entire building will be standing.
12/04/2013

We started tilting/lifting the wall panels today. By the end of the week the entire building will be standing.

The last concrete pour of wall panels was on 11/27 which is right on schedule.  Thank you to our concrete subcontractor ...
12/01/2013

The last concrete pour of wall panels was on 11/27 which is right on schedule. Thank you to our concrete subcontractor (BNG Construction) for meeting our schedule for all wall panels being poured before Thanksgiving.

This aerial is from 11/15 which shows construction of the wall panels on the ground floor slab and on the casting beds.
12/01/2013

This aerial is from 11/15 which shows construction of the wall panels on the ground floor slab and on the casting beds.

Address

Doctor Phillips, FL

Alerts

Be the first to know and let us send you an email when Construction of Dr. Phillips Elementary School posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Construction of Dr. Phillips Elementary School:

Share