🏗️ Construction Footing Details
- Excavation Length: 11.50 m
- Excavation Widths: 3.00 m, 1.50 m, 3.30 m
- Footing Spacing: 1.25 m
- Reinforcement Depth: 0.50 m
- Layout: Six square footings arranged in 2 rows × 3 columns
- Materials: Steel reinforcement grid + concrete pour from mixer truck
- Purpose: Strong foundation for load-bearing structural elements
---
📌 Key Notes
- Reinforcement bars are placed in a grid pattern for structural stability.
- Proper excavation dimensions ensure footing alignment and load distribution.
- Concrete pouring is ongoing, highlighting real-time construction progress.
---