08/09/2026
This job threw the book at us and our crew killed it..... A list of all the different systems that went into this project.
•Tru Polishable overlay w/ grout coat
• MVB primer before flake wl an epoxy grout coat and HW
Urethane topcoat
• 4" cove w/ zink schluter
• cant cove around shower area
• entire shower area sloped with epoxy mortar
• 8' resu wall HP with flake broadcast