07/08/2026
New on the Blog: Meet the Team Behind the Drawings
Every great design starts long before construction begins, Dave Moore and Steve Collins are a huge part of making that happen.
With more than 30 years of drafting experience each, these two Senior Draftsmen transform ideas into precise construction documents that keep our projects moving forward. Their technical expertise, attention to detail, and willingness to support our design team make them an invaluable part of SDG Architecture. Our drafting team plays a critical role in delivering the quality and service our clients have come to expect.
We're proud to shine the spotlight on Dave and Steve. To learn more about the people behind the plans, head over to the blog. đź“–
https://sdgfl.com/2026/07/08/celebrating-the-expertise-behind-our-designs-david-moore-steve-collins/