08/02/2026
This week 5 of us spent about 3 plus days rough-shaping sh*tty-shaped rock into near usable wall stone. Then we still have to organize it all by sizes and move all of them to the other side of the house.
Then, we organize it on the ground by sizes again along 2 sides of a 176 linear feet of wall. Then we finish shaping each piece before setting.
A rough estimate is around 6-7,500 stones just for this long wall.
(I calculated the other day that when done we will have built approximately 7,000 face feet of various types of walls.)
1- LEAD DESIGNER & PROJECT DIRECTOR:
Sam Johnson Samuel Johnson & Sam Johnson
2- TEAM:
- Tim Timnation
- Tanner
- Nate (new guy)
- Myself
3) MATERIALS, TOOLS, MISC.:
- Moving towards 900 tons of 100% raw ROCK dumped on site that we turn into STONE with tools
- 100% of every stone on this project has been shaped by us with drills, feathers/ wedges, saws, grinders, hammers and chisels
- Excavator, walk-behind, MQuip vacuum lifter are our machines
We got about another 2,000 face feet of freestanding stone wall to build and more features.