04/24/2026
I was hired by Gar Kenyon Areo space and defense design to build them two inspection offices. Keeping in mind that dust control is a key factor. I designed the layout Framed, Insulated, sheetrocked, Taped 3 coats sand, Drop ceilings, and 2 mini splits for heat and cool air. Very satisfied on how this came out. Very nice people.