06/03/2026
Two days ago, our team successfully completed this railroad crossing project in Mercedes, TX. π§
While every bore presents its own challenges, railroad crossings require an extra level of planning and precision. For this installation, we were required to maintain a depth of approximately 15 feet beneath the tracks, ensuring the railroad infrastructure remained protected while safely installing the conduit.
Great job, team! π