08/09/2026
Phase 1 came and went, and what a start to this project.
We got the retaining wall knocked out using Vera-Loc Flagstone Blend with charcoal caps. There was a lot of hard work, planning, and logistics that went into getting this phase across the finish line.
Jobs like this — and honestly, jobs in general — don’t happen because of one company. It takes a whole network of small businesses and good people working together to keep the machine moving.
A huge shoutout to Twin A Equipment Repair. These guys keep countless machines rolling across numerous counties, and they even spent part of their Sunday out here helping us diagnose a problem so we could stay on schedule. That’s the kind of service you don’t forget.
Another shoutout to Harris Electrical for fitting us into their schedule on a moment’s notice when we needed a hand.
And Phase 1 wouldn’t have gone down nearly as smooth without the fellas and friends at Material & Labor Solutions. They put in plenty of hours alongside us on this one, rain or shine, and helped keep things moving when we needed it.
A big thank you as well to Jeff and Katrina for trusting Material & Labor Solutions and Simon Concrete Solutions with their project. That kind of trust means a lot, and it’s what allows us to bring projects like this to life the right way.
At the end of the day, it’s always a team effort — no matter whose shirt you’re wearing.
Phase 1 is in the books. On to the next phase: pool coping, colored and stamped borders, and a colored and stamped pool deck.