Nyleve Bridge Corp.

Nyleve Bridge Corp. Our story began in the 1950s in the Lehigh Valley. Nyleve Bridge Corp.

has since evolved into one of the top bridge contractors in Pennsylvania, tackling some of the most challenging structures in eastern Pennsylvania. Our heavy highway construction services include new bridge construction, bridge rehab, concrete demolition, utility bridges and walkways, heavy concrete work, box culverts, sheeting, shoring, and piling. We've assembled a team of the most qualified tal

ent our region has to offer, but we're always looking for good people. Visit https://www.schultzorg.com/career-opportunities for our current openings or message us directly.

Nyleve has built a reputation for tackling the harder projects since we were founded in the 1950’s. We did it by stickin...
08/28/2026

Nyleve has built a reputation for tackling the harder projects since we were founded in the 1950’s. We did it by sticking to a few key themes:

Focus on Industry Fundamentals

Value our Partners

Stay Open to New Technologies

Support Our People

Keep Improving Our Specialties

When you drive through the completed SR 84 reconstruction project we've been working on for the past few years, you'll p...
08/21/2026

When you drive through the completed SR 84 reconstruction project we've been working on for the past few years, you'll probably notice the new bridges and roads. You probably won't notice the new guiderail, drainage, curbing, signage, landscaping, lighting.

These major infrastructure projects take an incredible amount of effort that the public will never see. It takes time, money, and reputable contractors with the expertise to get the job done. Nyleve has been at it since the 1950s, and we wouldn't have it any other way.

We're out in force filling formwork on the SR 390 Westbound Bridge in Pike County.
08/14/2026

We're out in force filling formwork on the SR 390 Westbound Bridge in Pike County.

Nyleve crews are making serious progress on the SR 390 Westbound Bridge in Pike County. This is the last structure on ou...
07/29/2026

Nyleve crews are making serious progress on the SR 390 Westbound Bridge in Pike County. This is the last structure on our SR 84 Reconstruction project, which has been under construction for the past four years. Once completed, this project will deliver a much smoother and safer experience for drivers in the Lake Wallenpaupack area.

Nyleve's Kent Wible (second from right) recently attended the Associated Pennsylvania Constructors - APC Summer Board Me...
07/22/2026

Nyleve's Kent Wible (second from right) recently attended the Associated Pennsylvania Constructors - APC Summer Board Meeting. He serves as Treasurer, board member, and has been a member of several committees over the years. Kent is making us proud by continuing Nyleve's long-standing tradition of supporting APC. Photo credit: APC

We're celebrating 250 incredible years of American independence. Happy 4th!
07/02/2026

We're celebrating 250 incredible years of American independence. Happy 4th!

The engineering that goes into a single heavy lift is extensive. We typically work from a muti-page er****on plan that c...
06/25/2026

The engineering that goes into a single heavy lift is extensive. We typically work from a muti-page er****on plan that covers every aspect, from crane and rigging specs, to er****on sequencing, to site preparation and logistics. The goal is to make sure the structure is sound and everyone is safe during construction.

As Benjamin Franklin once said, "By failing to prepare, you are preparing to fail." ****onplan

06/12/2026

This is what crossing your T's and dotting your I's looks like when setting a bridge beam...

Steel wasn't always the material of choice for bridge abutment formwork.
05/29/2026

Steel wasn't always the material of choice for bridge abutment formwork.

Nyleve Bridge Corp. earned an Excellence in Concrete Award in the Infrastructure category for our SR 209/SR 33 Bridge Re...
05/14/2026

Nyleve Bridge Corp. earned an Excellence in Concrete Award in the Infrastructure category for our SR 209/SR 33 Bridge Replacement project from the Eastern Pennsylvania & Delaware Chapter of the American Concrete Institute (ACI). The award was presented on April 30 at The Inn at Villanova University.

Nyleve superintendent Bob Baker (left) is pictured with Will Fellmeth of Wilmer R. Schultz Corporation (center) and Olvin Espinosa from our ready-mix supplier Casilio Concrete.

The success of this project was made possible thanks to a strong partnership with PennDOT District 5-0 and the support of a strong project team.

Address

1540 Chestnut Street
Emmaus, PA
18049

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+16109653083

Alerts

Be the first to know and let us send you an email when Nyleve Bridge Corp. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Nyleve Bridge Corp.:

Shortcuts

Share