06/19/2026
Leading Edge Construction is excited to kick off a new renovation project at The Ethel Walker School in Simsbury, CT, transforming a covered pedestrian connector that links two campus buildings. Working alongside Colliers Engineering & Design and Szewczak, Kilty & Fluhr Structural Engineers, P.C., the project includes selective demolition, structural rehabilitation, installation of a new aluminum and glass wall system, and updated building entrances, architectural finishes and lighting.
This renovation presents several unique challenges. The connector is located in a tight space between two existing buildings, requiring careful excavation and foundation work adjacent to occupied structures. The team will also implement a specialized temporary support system to carry the load of the existing structure while new footings, piers, and column bases are installed.
With a limited construction window between graduation and summer programming, coordination and scheduling will be critical to keeping the project on track for completion ahead of the fall semester.
We look forward to sharing progress updates as work continues on this campus improvement project.