Hoban Woodworks LLC

Hoban Woodworks LLC Residential remodel and general construction. Licensed / Bonded / Insured
lic. # HOBANWL841DU

Removed old vanity, bathtub, toilet, vinyl floor, installed all new fixtures, tile in shower and vinyl plank flooring
05/24/2021

Removed old vanity, bathtub, toilet, vinyl floor, installed all new fixtures, tile in shower and vinyl plank flooring

Ripped out an old claw foot tub that was covered with tile and framed a wall and installed a new tub/ shower, new plumbi...
08/13/2020

Ripped out an old claw foot tub that was covered with tile and framed a wall and installed a new tub/ shower, new plumbing fixtures, ripped out the 3 old layers of flooring and installed a new tile floor, ripped out wall board and installed subway tiles, installed new bathroom fan, and toilet

This was a decent sized master bathroom remodel, new tub/shower and tile with a niche.  Ripped out the carpet and instal...
08/13/2020

This was a decent sized master bathroom remodel, new tub/shower and tile with a niche. Ripped out the carpet and installed marble like ceramic floor. Plumbed the single sink into 2 sinks, and ran new lights. Installed new pocket door and hardware, remodeled closet shelves, spray painted all the trim and doors and closet shelves. Installed 1/4" plywood to look like shiplap behind the new vanity, and installed a laundry chute inside the closet to the laundry room downstairs

Plumbed in a new laundry room sink, and installed cabinets and butcher block counters
08/13/2020

Plumbed in a new laundry room sink, and installed cabinets and butcher block counters

Built an 800sqft deck!
01/12/2020

Built an 800sqft deck!

Installed this laundry room floor. Replaced a section of the subfloor, then new hardi and tile
08/11/2019

Installed this laundry room floor. Replaced a section of the subfloor, then new hardi and tile

Bathroom remodel. Installed heated floors and tile, new vanity and toilet
08/11/2019

Bathroom remodel. Installed heated floors and tile, new vanity and toilet

Bathroom remodel.  Installed new bathtub, heated floor, tile, all new fixtures
08/11/2019

Bathroom remodel. Installed new bathtub, heated floor, tile, all new fixtures

Complete master bathroom remodel. Subfloor was ruined around and under the old shower. Installed new insulation and subf...
08/11/2019

Complete master bathroom remodel. Subfloor was ruined around and under the old shower. Installed new insulation and subfloor, heated floor, floor tile, hydroblok shower system, all new fixtures

Installed floor tile changed out the vanity, installed new lights and a new mirror
08/11/2019

Installed floor tile changed out the vanity, installed new lights and a new mirror

Installed tile on backsplash and around the window
08/11/2019

Installed tile on backsplash and around the window

Removed all the old cracked tile, installed ditra  on the floor to prevent cracking and used hydroblok for the shower. I...
05/09/2019

Removed all the old cracked tile, installed ditra on the floor to prevent cracking and used hydroblok for the shower. Installed new 16×32 porcelain tile and 1×1 glass tile on the shower floor

Address

Enumclaw, WA
98022

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Telephone

+14254421425

Website

Alerts

Be the first to know and let us send you an email when Hoban Woodworks LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category