06/09/2026
A full day of blocking and floor prep work was completed earlier this week and we’re ready now for drywall. It’s critical to take time with the prep to make sure all the walls are plum and straight, ceilings are level, and proper blocking is in place for shower glass and other critical items. Especially in old 1920s Chicago bathrooms. Definitely not a step to be skipped! We purchased the shower wall materials and we started to put up our first piece of drywall. Make no mistake this is incredibly hard work. Between purchasing materials this am, delivering them to the site, loading them in up two flights of stairs, and then INSTALLING THEM today has been a day!