08/03/2026
When we walked into this master bedroom for the first time, the closets were stripped to bare framing, the ceiling fan was barely hanging, and every finish in the room had been neglected for years.
This room deserved better. So we started from scratch.
New recessed lighting. New ceiling fan. New LVP flooring with subfloor and moisture-proof underlayment. New baseboards, shoe molding, and window trim. Rebuilt closet structure and framing. New closet doors. New linen closet with custom shelving. Fresh paint on every surface β walls, ceiling, and all trim.
Every single finish in this room is new. Nothing was patched. Nothing was painted over. It was done right.
This is what a master bedroom should feel like β calm, clean, and built to last.
π Northern Virginia
π JBL Construct LLC β Class A Licensed Design Build Contractor