10/22/2026
Brick is going up at Flats on 14th, and the building is taking on its permanent look.
Masonry is moving along the south and east sides while the fourth floor wraps up HVAC installation and paver curbs, with electrical work underway. The site also passed bacteria testing this week, an important step for the utility systems future residents will rely on every day.
Some milestones are easy to photograph. Others happen out of sight. Both matter to the families who will call Flats on 14th home.
Thank you to TWG Development for the partnership in Columbus.
Built on relationships. Driven by excellence.