Precise Building Contractors, Inc.

Precise Building Contractors, Inc. Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Precise Building Contractors, Inc., Contractor, Fort Wayne, IN.

Our work includes roofing, garages, room additions, remodeling, siding, exterior and interior painting, porches, decks, insurance loss projects, masonry/stone work, concrete work/concrete stamping, boom truck & concrete pumping services & much more..

August 2021:  Excavate, form up, install rebar and pour 20’x20’ foundation for future mausoleum in Illinois.
08/17/2021

August 2021: Excavate, form up, install rebar and pour 20’x20’ foundation for future mausoleum in Illinois.

July 2021:  Roof project consisted of stripping off old roofing down to deck, install new plywood and synthetic paper. ...
08/17/2021

July 2021: Roof project consisted of stripping off old roofing down to deck, install new plywood and synthetic paper. Installed new shingles and drip edge.

Project in July 2021:  Deck repair consisted of demolishing all the old floor, rails and stairs. Installed new deck boa...
08/17/2021

Project in July 2021: Deck repair consisted of demolishing all the old floor, rails and stairs. Installed new deck boards, new stairway with rails and pickets. Installed new rails & pickets on upper deck.

Project in June 2021:  Remove & replace posts, install screen under and in porch area. Remove & replace posts, pickets &...
08/17/2021

Project in June 2021: Remove & replace posts, install screen under and in porch area. Remove & replace posts, pickets & rails on both upper and lower decks. Install one Anderson storm door in screened porch area and one on upper deck area.

Project in June 2021:  Installed concrete patio with heavy stone stamp, deep charcoal color and acrylic seal.
08/17/2021

Project in June 2021: Installed concrete patio with heavy stone stamp, deep charcoal color and acrylic seal.

Project in June 2021:  Installed posts in ground with concrete with floor joists on girder system.  Installed 14’x60’ de...
08/17/2021

Project in June 2021: Installed posts in ground with concrete with floor joists on girder system. Installed 14’x60’ deck with steps and rails on the main construction trailer at a major building project in Fort Wayne. Painted the steps and rails.

Project in May 2021:  Demo fireplace material down to studs, removed door on left of fireplace and drywall down to studs...
08/17/2021

Project in May 2021: Demo fireplace material down to studs, removed door on left of fireplace and drywall down to studs. Frame wall, shelving and top of hearth. Electrical done for new TV, new heat element/insert fireplace and four new lighted shelving units. Install stone on wall, around hearth and installed 2” limestone for hearth.

Project from November 2020 - May 2021:  Demo old deck, tree & landscaping. Install girder system & floor system for new ...
08/17/2021

Project from November 2020 - May 2021: Demo old deck, tree & landscaping. Install girder system & floor system for new screened in porch. Install Timber Tech Pro for floor, deck and stairs with decorative rail. Removed existing window & installed new Anderson Narrow Line sliding patio door. Remove existing exterior door, frame in opening, install new subsiding, v***r barrier, insulation and drywall. Framed 11’6”x12’ screened in porch with open beam concept in cedar and installed 2 storm doors. Installed standing seam metal roof. Poured 12’x16’ curved concrete patio including stamp & color. Built exterior cabinet for Big Green Egg Grill out of concrete CMU block with veneer stone, limestone caps and stainless steel door. Electrical installed inside of porch for ceiling fan, interior & exterior lighting and to exterior cabinet.

Project in April 2021:  Installed 2 niche cabinets with trellis at a local Fort Wayne Cemetery.
08/17/2021

Project in April 2021: Installed 2 niche cabinets with trellis at a local Fort Wayne Cemetery.

Project in May 2021:  Installed screen around existing covered porch.
08/17/2021

Project in May 2021: Installed screen around existing covered porch.

Project from March 2021:  Removed existing concrete patio.  Installed girder system, floor joists with bridging blocks a...
08/17/2021

Project from March 2021: Removed existing concrete patio. Installed girder system, floor joists with bridging blocks and Trex deck with rail.

Project in March 2021:  Install 36” metal door, replace stairs and install a “Bilco” cellar door.
08/17/2021

Project in March 2021: Install 36” metal door, replace stairs and install a “Bilco” cellar door.

Address

Fort Wayne, IN

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Precise Building Contractors, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Precise Building Contractors, Inc.:

Share

Category