Monday job update:
The crew at 7 Brew Coffee is taking big steps. They have completed erosion control, all the demo work, earthwork, undercuts, water line, and are starting to get sanitary lines in the ground. The 7 Brew building was delivered and placed last week as well.
The guys at Myron Meadows have been working hard to get the site up to grade. They have dug and backfilled two borrow pits, dug and put to grade a pond, and are putting the final touches on site grade. Pipe should be going into the ground this week.
We also had a crew down in Marion getting Zaxby’s ready for asphalt and a crew putting the final touches on a new distillery in North West Fort Wayne.
Long days, hard work, and a lot of determination is what it takes to keep a job flowing. Although the weather has not been in our favor, both crews have been working through it to keep the jobs moving along.