06/17/2026
Another successful RTU swap completed. Our team coordinated the removal and replacement of 61 roof top units while maintaining site safety, schedule, and quality control throughout the process at our Eric Davis ES Renovation CMAR.
Great teamwork between all trades to ensure a smooth installation and minimal disruption to operations. Kudos to Roderick, Jordan, Nate, Josue and all of the Post L Group Team. Let’s fly!!!