Zimmermann Dream, Design, Build

Call Directions Website Contact the business

Zimmermann Dream, Design, Build We pride ourselves on giving you a top quality finished project, with attention to detail, at an exceptional value.

New tops, sink, faucet and backsplash. Less than 7 day turnaround. Not badNew Color scheme is much lighter and more invi...
10/24/2026

New tops, sink, faucet and backsplash. Less than 7 day turnaround. Not bad
New Color scheme is much lighter and more inviting.

Raw hickory door, is in and finished in the kitchen remodel. One day…..
10/24/2026

Raw hickory door, is in and finished in the kitchen remodel. One day…..

A little countertop replacement it’s gonna be nice update for them. Once the backsplash and everything is done.
10/17/2026

A little countertop replacement it’s gonna be nice update for them. Once the backsplash and everything is done.

A little demo action this week. The most interesting thing is when I pulled one of the countertops off it said.Driason w...
10/17/2026

A little demo action this week. The most interesting thing is when I pulled one of the countertops off it said.Driason which is the name of my dad’s company so he actually built the house back in 89 and I want to get to remodel it. It’s pretty cool.

Lower level suite is coming together nicely. Egress window well, powder room turned into a full bath, bar area turned in...
10/13/2026

Lower level suite is coming together nicely. Egress window well, powder room turned into a full bath, bar area turned into full kitchen and the old storage area turning into a ““ flex room.
A lot of the space was existing so it just needed to be modified doors moved.

I started this job three weeks ago Inspection tomorrow Spray foam tomorrow afternoon Drywall before the end of the week....
09/22/2026

I started this job three weeks ago Inspection tomorrow Spray foam tomorrow afternoon Drywall before the end of the week.

New acrylic, shower, module, and shower control, in the morning usable by the evening.
09/01/2026

New acrylic, shower, module, and shower control, in the morning usable by the evening.

Basement spuce up, extended the rubber floor, black ceiling paint, new drywall, extended a couple walls and a new vinyl ...
09/01/2026

Basement spuce up, extended the rubber floor, black ceiling paint, new drywall, extended a couple walls and a new vinyl window. Like 9 days

In the next week, this kitchen will be wrapped up. Took out all the old cabinets leveled the floor. Put new cabinets in ...
08/25/2026

In the next week, this kitchen will be wrapped up.
Took out all the old cabinets leveled the floor. Put new cabinets in that go all the way up to the ceiling with the uppers. Put in a huge Peninsula it’s gonna be great for holidays and other get-togethers. All new LVP throughout a lot of the first floor. the biggest thing we did here was slapped up a 15 foot header to open up The Four Seasons room to the kitchen. I think we’re at week like six. Next week Anderson gets the countertops in and then Nordic Plumbing can come in and button up.

This little rec room spruce up is ready for drywall and finishes. Switched out the window to vinyl, added some walls/fin...
08/20/2026

This little rec room spruce up is ready for drywall and finishes. Switched out the window to vinyl, added some walls/finished areas and lighting and outlets. Four days in.

Address

W198N11519 Jamestree Road
Germantown, WI
53022

Alerts

Be the first to know and let us send you an email when Zimmermann Dream, Design, Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Zimmermann Dream, Design, Build:

Shortcuts

Share

Category