07/22/2026
Broke ground for another new build last week! Suffered a breakdown but we pushed through stayed late, got it repaired, and had the excavation done on schedule for the concrete guys.
We will be headed back after the walls are poured to install footing drains and backfill.
We are doing a full site package with all necessary excavation for utilities, septic system installation, and all the way to final grade and lawn install!