05/27/2026
Flushing project. Demoed out the old tile surround and tub to the studs. Demoed the old tile floor and subfloor to make the new tile flush with the hardwood floors. Shower walls got a 3”x12” tile on a vertical 1/3 stagger. The shower floor and bathroom floor got a 24”x48” tile straight laid. The shower floor got a line drain. Dave Watson with Watsons Handyman Services did electrical upgrades/ exhaust fan/ added some can lights in. Gary Roper did all the plumbing. New vanity, new door to closet, new shelves, new trim, fresh paint on ceilings and walls. Counters are in just behind on current photo.