09/19/2026
As we put the final touches on our Campau Lake job, we would personally like to thank the Brown family for putting their trust in our company and letting us give your family something that they can enjoy for many years to come! This job included removing 95 yards of fill, 45 yards of concrete, then installing 45 yards of pea stone for the lower concrete areas due to the high water table, 45 yards of crushed concrete and 30 yards of screened top soil. We installed 91 yards of concrete, 420 feet of expansion that (200 feet already caulked), 200 sticks of number 4 fiberglass rebar 20’ long, 3 cans of sealer and included 200 feet of schedule 40 4” pvc pipe for trench drain and down spouts. Also we regraded the front yard to allow water to drain and this included seed, fertilizer and straw mats. Our team will be back in 30 days to caulk the upper driveway expansion, stain the stamped compass and seal everything up top! Here is a few pictures first of what we started with and some after pictures! Checker board broom has been a very popular request from our customers this year! We would also like to thank so many of our great suppliers including Zach Wiseman at Carroll Supply, Justin Bultsma for always taking care of our material needs, Josh at Airport sand and landscape supply and Consumers Concrete projects like these are not possible without some amazing suppliers!