07/29/2024
So just some mentally exhausting copper skylight work. This is true traditional stuff with internal gutter and drains. True condensation gutter on all hips and side frame.
Main frame fabrication was an entire day. Then because we are going into an existing curb and inside corner that were not square ofcourse...... it fit perfect. So Saturday was cutting and soldering in the entire unit. 6 am to 7pm and then Sunday 4hrs. Nobody understands how long these units take to make. Never mind I still need to do glass and all the copper covers.