Christoforetti Building Contractors LLC

Christoforetti Building Contractors LLC We'll do anything from the honey do list, to remodeling, major additions, or even light commercial work. Our slogan is big or small we do them all!

I just finished my sister's kitchen it was a total gut outThere were many obstacles to over come. But with the help of m...
08/11/2023

I just finished my sister's kitchen it was a total gut out
There were many obstacles to over come. But with the help of my friend jim we endured
The most challenging was the three tile pattern on the floor trying to keep the repeat going was a challenge
The most tedious job was doing the herringbone tile on the wall all in all the job turned out great and my sister loves her new kitchen. Here are some pictures of the finished project I took them with the lights on and with them off

Finished doing a fireplace. Had to go.thru brick and block and had to install steel lentles to hold both up . Gas Firepl...
12/20/2022

Finished doing a fireplace. Had to go.thru brick and block and had to install steel lentles to hold both up . Gas Fireplace needed to be installed flush with inside so I had to build a dog dormer to accommodate fireplace. Here are pictured enjoy

I did a kitchen addition and deck in 2004 in which the customer wanted to add a set of stairs and landing so they can ge...
10/14/2022

I did a kitchen addition and deck in 2004 in which the customer wanted to add a set of stairs and landing so they can get onto the garage roof. The under carriage of existing deck was sound so I just replaced the Decking and ballistrad system on existing deck. Here are a few pictures enjoy

I have not posted in a while because I was doing a lot of handyman work  Just finished doing a kitchen. I had major prob...
10/01/2022

I have not posted in a while because I was doing a lot of handyman work
Just finished doing a kitchen. I had major problems with Wall between kitchen and dining room which was a bearing wall and was eaten away by termites
I had to hold up two roofs and both ceilings.
The electrical panel was in bad shape and had to be replaced and upgraded. . The backslash tile was a mosaic tile on a vinyl mesh
I called in my friend jim Spence to.help.me with tile which was very difficult to lay because the tile was coming off of the mesh. Here are the pictures enjoy

Finally after waiting 15 weeks for back door and 22 weeks for front window my garage conversion job is done. The focal p...
01/06/2022

Finally after waiting 15 weeks for back door and 22 weeks for front window my garage conversion job is done. The focal point of the new room is the pillar I made to cover up lolly column. Here are the final pictures.

We took the one car garage and added it to the existing family room and made it one room we  reconfigured the back of th...
10/19/2021

We took the one car garage and added it to the existing family room and made it one room we reconfigured the back of the garage and made a full bath. We also reconfigured the utility room to house the washer and dryer. We are now waiting for the rest of the materials to come in which will. Not be in until Dec 22 even though they were ordered in September

Basement had flooded because of sump pump failure during a storm where we got 6 inches of rain . We totally gutted the b...
10/19/2021

Basement had flooded because of sump pump failure during a storm where we got 6 inches of rain . We totally gutted the basement and started from scratch. I streamlined the basement and gave them lots of closet space. Notice the pillars it is not just a sheetrock box for a pillar. I built a custom cabinet to hide the panel box and cable equipment

After my bath room I removed the rug in master bed room,hallway and stairs, enlarged the walk in closet and installed ne...
10/19/2021

After my bath room I removed the rug in master bed room,hallway and stairs, enlarged the walk in closet and installed new wire shelving in walk in closet installed brazilian teak hard wood floor in bed room, closet and hallway. Waiting for area rug on steps. I removed the entire ballistrade system and replaced it with one that is up to code

My bath room is finally done. All that is missing is the valance over the window. Took a shower it was great lots of roo...
07/08/2020

My bath room is finally done. All that is missing is the valance over the window. Took a shower it was great lots of room. Now to finish the walk in closet and to remove all the trash
Dumpster is coming july 10th.

Well the in law suite is finally done. Where the garage door was is now a wall with a twin window in it. Off to my next ...
07/01/2020

Well the in law suite is finally done. Where the garage door was is now a wall with a twin window in it. Off to my next adventure

As you can see I finished the tiling in the shower just need to grout the floor and bottom row of tile. The electric hea...
04/07/2020

As you can see I finished the tiling in the shower just need to grout the floor and bottom row of tile. The electric heat is installed in the floor complete with a skim coat to protect the wire when installing the tile. Getting ready to install floor tile. Aldefer glass will be out tomorrow to measure for the glass shower enclosue

As you can see mold and moisture resistant sheetrock was installed. Ceiling and walls are painted with mold resistant pa...
03/29/2020

As you can see mold and moisture resistant sheetrock was installed. Ceiling and walls are painted with mold resistant paint. Accent wall and niche are done .seat and shelves are installed. With the outbreak of the Corona virus and not being able to work until at least mid april I am putting 12 hour days in. It is possible that the bath room will be completed
By the time I can get back to work. Originally with my big job in philly going on it would take me 6 months to complete the bath room. It is not the case now. Enjoy. Next up is finishing the shower then install the floor heat and floor tile.
Till next time.

Address

690 Andrews Drive
Harleysville, PA
19438

Alerts

Be the first to know and let us send you an email when Christoforetti Building Contractors LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Christoforetti Building Contractors LLC:

Share

Category