04/27/2025
Removed concrete pavers from deck. They crushed the foam system underlayment. Installed new tapered foam system with 3 1/2 inch thickness at building to 1/2 inch at wall. Then installed 060. Reinforced rubber with 6inch seams with 6inch cover tape over all seams. Removed wall cap and redid all rubber at wall area. Then installed original wall cap. Then finished with a commercial carpet. Job turned out nice