Another tough one knocked out by TE Construction LLC.
This area behind the pond dam had constant running water and had turned into a swamp. We came in, dewatered the area, and got the water flowing correctly so the ground could dry enough to work. Once stabilized, we dug leach ditches throughout the area, lined everything with surge rock for drainage and erosion control, and installed an 18” tinhorn to make the crossing solid and usable again.
We also removed trees and burned off a large brush pile cleaning up the entire area up while we were there. Big difference from where it started.
If you’ve got wet areas, drainage problems, pond issues, or property cleanup needs, give TE Construction LLC a call.